Real-Time Simulation and Testing search search close
Speedgoat Test Systems

Speedgoat Test Systems

Rapidly innovate control designs, and thoroughly test embedded controllers.

Learn more
Hardware-in-the-Loop Simulation

Hardware-in-the-Loop Simulation

Effectively test controls with real-time digital twins and automated testing.

Learn more
Rapid Control Prototyping

Rapid Control Prototyping

Accelerate control design innovation with model-based design ready solutions for a worry-free test and simulation experience.

Learn more
Electrification

Electrification

Design, test, and validate digital controls for electric motors, power converters, and battery management systems.

Learn more

Upcoming Events

Date
Event
Location
09 - 11 Apr 2024
Nuremberg, Germany
17 - 18 Apr 2024
Munich, Germany
07 May 2024
Stuttgart, Germany
04 - 06 Jun 2024
Stuttgart, Germany
12 - 14 Jun 2024
Shanghai, China
18 - 20 Jun 2024
Stuttgart, Germany
18 - 20 Jun 2024
Amsterdam, Netherlands
25 - 30 Aug 2024
Paris, France
26 - 29 Aug 2024
Maryland, USA
28 - 30 Aug 2024
Shanghai, China
07 - 10 Oct 2024
Detroit, USA
22 - 24 Oct 2024
Novi, USA
30 - 31 Oct 2024
Frankfurt, Germany
12 - 14 Nov 2024
Nuremberg, Germany
19 - 21 Nov 2024
Bremen, Germany
Show all

News

Test Charging Controllers of Electric Vehicles and Charging Stations

Test Charging Controllers of Electric Vehicles and Charging Stations

Test the charging controllers of your electric vehicle (EV) or the charging station with the EV/EVSE CCS Charging Interface. Accurately emulate the communication and control signals between the EV and the charging station according to the IEC 61851, SAE J1772, DIN 70121, and ISO 15118-3  communication standards.

Test Power Electronics Devices at Power Levels up to 90 kW

Test Power Electronics Devices at Power Levels up to 90 kW

Test your motor drives and inverters at rated power levels of up to 90 kW by connecting the APS 4-Quadrant power amplifiers from Spitzenberger & Spies to Speedgoat test systems. Test safely by emulating electric motors, power grids, or industrial robots with this test setup.

Show all

Follow Speedgoat LinkedIn